KB4 Aluminium Bridges
Ref: 11578
KB4 Swedish manufactured emergency bridging. Aluminium construction.
High quality. Approx. 4 hrs per bridge erection time.
Does not require any crane facilities.
These bridges are counter balanced upon erection with only manpower to assemble.
The bridge has the following capacities:50,00.. read
more