Heavy Duty 13.5M Bridge

Ref: 50523
No 12 Heavy Duty 13.5M Bridge Comprising of 2x Aluminium sections each length 13.5m long, 1.5m wide and 70cm high at the centre    .. read more
Qty Available: 7 £ POA Request a quote More Info

KB4 Aluminium Bridges

Ref: 11578
KB4 Swedish manufactured emergency bridging. Aluminium construction. High quality. Approx. 4 hrs per bridge erection time. Does not require any crane facilities. These bridges are counter balanced upon erection with only manpower to assemble. The bridge has the following capacities:50,00.. read more
Qty Available: 2 £ POA Request a quote More Info